| 研究生: |
賴韻如 Lia, Yin-lu |
|---|---|
| 論文名稱: |
橋梁墩柱劣化之模糊失誤樹分析 Fuzzy Fault Tree Analysis of Bridge Pier Deterioration |
| 指導教授: |
潘南飛
Pan, Nang-Fei |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木工程學系 Department of Civil Engineering |
| 論文出版年: | 2009 |
| 畢業學年度: | 97 |
| 語文別: | 中文 |
| 論文頁數: | 72 |
| 中文關鍵詞: | 橋墩 、劣化 、模糊失誤樹分析 |
| 外文關鍵詞: | piers, Fuzzy Fault Tree Analysis., deterioration |
| 相關次數: | 點閱:124 下載:8 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
橋墩(Piers)為橋梁重要之組成構件,因長期暴露於外在環境,受人為破壞及天然災害的機率頻繁,劣化為無可避免的現象。因此橋墩劣化與其劣化因子間的分析與探討,為橋樑安全維護中一項重要之課題。失誤樹分析(FTA)為一種廣為工業界認同,可有效地分析失誤事件之因果關係與發生機率的技術。然而若因子中多具含糊性 (如人為錯誤),則難以準確地估計出缺失發生的機率,而模糊失誤樹分析(FFTA)可解決此使用上之限制,評估出模糊事件的失誤率。鑑此,本研究利用模糊失誤樹來分析橋墩劣化之機率與各影響劣化因子之重要度,結果顯示橋墩位處之河川環境狀況,對於跨河橋橋墩劣化之影響最為直接且顯著。此研究成果可供橋梁管理相關單位擬定養護策略之參考,以達節省人力、物力及資源有效分配之目標。
The piers are essential components for a bridge. Due to its exposure to external environment, the possibilities of the damage by human beings or natural disasters could be increasing, which become inevitable situation. The bridge deterioration problem should be analyzed and deeply investigated in the study, which become one of the most important security issue in the maintenance for the risky bridges. Fault Tree Analysis (FTA), a widely recognized technique for industry safety, can effectivelyevaluate cause-and-effect relationship and accident probability. However, it’s difficult to accurately assess accidentprobability when factors are vague (such as human error), and Fuzzy Fault Tree Analysis(FFTA) can be used to cope with this problem., to assess accident probabilities.In the study, fuzzy fault-tree method was used to analyze the probability of bridge deterioration and the importance degree of other deterioration factors. The results are discovered that the river environment is significant influence toward the bridge deterioration. The study findings can be the reference for bridge management institution to plan related maintenance strategy. That could be achieving the goal of labor conservation, effective distribution of materials and resource
英文部分
[1] Brito,J.de., and Branco,F.A., ”Concrete Bridge Management:From Desibn to
Maintenance,”Practice Periodical on structural design and Construction , 3(2), 68-75 .
[2] Chang L. M. , and Lee Y.J., “Evaluation of Performance of Bridge Deck
Expansion Joints”, Journal of Performance of Constructed Facilities, 16(1), 2002.
[3] David F. Haasl, Norman H.Roberts,William E. Vesely, Francine F. Goldberg,
「Fault Tree Handbook」, 1981.
[4] Fuzzy rule-based expert systems - Fuzzy logic and control: software and
hardware applications, Prentice Hall, Englewood Cliffs, N.J. 51-85.
[5] Hadipriono, F.C., “Expert System for Construction Safety. I: Fault-Tree Models”, Journal of Performance of Constructed Facilities, 6(4). 246-260,1992.
[6] Hong, Ann-Ping, Li, Yuan-Neng,and Bazant, Z. P., “Theory of Crack Spacing in
Concrete Pavement.” Journal of Engineering Mechanics-proceedings, 123(3), 267-275, 1997.
[7] Johnson, P. A., “Fault Tree Analysis of Bridge Failure due to Scour and Channel
Instability.” Journal of Infrastructure Systems, 5(1),35-41,1999.
[8] J.de Brito and F.A Branco,”An expert system for concrete bridge management”,
Journal of Engineering structures, 19.519-526.
[9] Lee, W. S., Grosh, D. L., Tillman, F.A. and Lie, C.H., “Fault tree analysis, methods, and applications - a review.” IEEE Transactions on Reliability, 34(3), 194-203, 1985.
[10] Member, S.M.A., “Fault-Tree Model of Bridge Element Deterioration Due to
Interaction” . Infrastruct. Syst, 3.103-130,1997.
[11] Michael Mauch and Samer Madanat, “Semiparamtric Hazard Models of
Reinforced Concrete Bridge Deck Deterioration.”, Journal of Infrastructure
Systems,2001.
[12] Pan, Nang-Fei, “Evaluation of building performance using fuzzy FTA.” Journal of Construction Management and Economics, 24, 1241-1252, 2006.
[13] Onisawa, T. “Fuzzy reliability assessment considering the influence of many factors on reliability.” International Journal of Approximate Reasoning, 5. 265-280, 1991.
[14] Saaty, T. L., The Analytic Hierarchy Process, McGraw-Hill, New York,1980.
[15] Sugeno, M., “Fuzzy measures and fuzzy integers-a survey.” Fuzzy Automation and Decision Processes, Amsterdam, North Holland, 1977.
[16] Tarek Zayed,R.Edward Minchin Jr,Anderw j.boyd,Gary R. smith,andMichael
C. McVay,M,”Model for the Physical Risk Assessment of Bridges with
UnKnown Foundation”, Journal of Perforamance of Construction Facilities,
2007 .
[17] Krasich and Milena, “Use of fault tree analysis for evaluation of
system-reliability Improvements in design phase”, Proceedings of the
AnnualReliability and Maintainability Symposium, Los Angeles, CA, USA ,
2000.
[18] Weiling Chiang, Kevin F.R.Liu., and Jonathan Lee, “Bridge Damage Assessment through Fuzzy Petri Net Based Expert System.” Journal of Computingincivil Engineering, 14(2).141-149,2002.
[19] Zadeh, L. A., “Fuzzy sets.” Information and Control, 8.338-353,1965.
[20] Z.Zhao, C. Chen.「Concrete bridge deterioration diagnosis using fuzzy inference
system」, Advance in Engineering Software , 32. 317-325, 2001.
中文部分
[1] 黃清賢,「簡介失誤樹分析」,嘉南藥專工業安全衛生科,1985。
[2] 李永豐、林安彥「橋梁檢測評估與補強」,全華科技圖書股份有限公司,2000。
[3] 李允中、王小璠、蘇木春,「模糊理論及其應用」,全華科技圖書股份有限
公司,2000。
[4] 林正宗,「油槽區設施安全之探討」,碩士論文,國立高雄第一科技大學
環境與安全研究所,2002。
[5] 張晉瑋,台灣地區鋼筋混凝土橋梁構件劣化模型之建立,碩士論文,國立中
央大學土木工程研究所,2004。
[6] 陳福民,「建築物擋土開挖事故風險之分析」,碩士論文,國立高雄應用科
技大學土木工程與防災科技研究所,2005。
[7] 薛淞林,「以模糊邏輯建構住宅建設投資決策模型—以中國沿海城市住宅建設
為例」,碩士論文,國立台灣科技大學建築研究所,2005。
[8] 賴逢昇,「資料探勘應用於橋樑劣化之關聯性分析」,碩士論文,國立高雄
應用科技大學土木工程與防災科技研究所,2005。
[9] 潘南飛,「建築基礎開挖崩塌事故之分析」,建築學報 第57期,2006。
[10] 潘南飛, 「模糊層級分析法應用於高雄地區深開挖擋土工法之評選」建築學
報第 57期,2006。
[11] 陳克劼,「類神經網路於台灣省道橋梁橋梁檢測資料分析及劣化預測之研究」,
碩士論文,國立台北科技大學土木與防災研究所,2007。
[12] 李豪剛,「運用資料探勘技術於臺灣鋼筋混凝土橋梁構件劣化因子之研究」,
碩士論文,國立中央大學營建管理研究所,2007。
[13] 李俊儀,「利用模糊樹方法建立企業診斷流程」,碩士論文,國立成功大學,
工業與資訊訊管理研究所,2007。
[14] 「98年度橋梁維護管理訓練講習」,交通部運輸研究所,2009。