| 研究生: |
潘又慧 Pan, Yu-Hui |
|---|---|
| 論文名稱: |
台灣建築設計單位於設計階段上應用BIM之表現 Delineating the BIM Performance of Taiwan's AEC Firms at Design Stage |
| 指導教授: |
曾俊達
Tzeng, Chun-Ta |
| 學位類別: |
碩士 Master |
| 系所名稱: |
規劃與設計學院 - 建築學系 Department of Architecture |
| 論文出版年: | 2010 |
| 畢業學年度: | 98 |
| 語文別: | 英文 |
| 論文頁數: | 124 |
| 外文關鍵詞: | BIM Performance, design stage, process standardisation, BIM Capability and Maturity, firms, productivity |
| 相關次數: | 點閱:116 下載:3 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
Industry discussions and academic literature abroad that profess the ability of Building Information Modelling (BIM) methodologies to increase productivity have been abundant. These are further endorsed by many instances of successful use of BIM in practice. In Taiwan, despite signs of increased BIM adoption by leading AEC firms in design projects, little is known about their performance due to a scarcity of publications. It is difficult to ascertain the extent to which BIM is being adopted to improve productivity. In response, this thesis aims to investigate the BIM performance of Taiwanese AEC firms at design stage, where decisions are the most critical to overall project success.
BIM process standardisation is explored at four levels: innovation, firm, industry and economy levels. Studies consider BIM as a systemic innovation that impacts multiple firms. To evolve from firm level use to industry level adoption requires integration among project teams through business process re-engineering, with the end goal of achieving an integrated project delivery (IPD). The scope of BIM use is studied in terms of number of organisations and variety of domains. To capture a more detailed insight into BIM performance, BIM Capability and Maturity models are examined to produce a list of indicators that are used to generate a BIM Performance Analysis Framework for evaluating the BIM performance of firms in Taiwan that have adopted BIM.
Two research questions are established and addressed through field study. The investigation of practice adopts a case-study approach where four of the country’s leading architecture firms and engineering consultants (ECs) and an international architecture design firm are selected. Strategies for data collection involve participation and direct observation, interview and study of documents and archival records.
Findings reveal BIM to be deployed primarily for visualisation and design coordination where collaboration remains largely intra-organisational. Where BIM has the potential to generate transformational effects for firms, only automational and informational effects are achieved, due to difficulties of applying strategic thinking and increasing the BIM market. The utilisation of BIM for purposes of Analysis and Supply Chain Integration to achieve transformational effects is hampered by problems that are legal, technological and organisational. The thesis concludes with suggestions of ways to facilitate a top-down approach to BIM implementation to reap true productivity benefits from BIM use.
AIA, Integrated Project Delivery: A Guide, Version 1, The American Institute of Architects California Council, California, 2007.
Andersen, B., Business process improvement toolbox. Milwaukee: ASQ Quality Press, 1998.
Aouad, G., Lee, A. & Song, W., From 3D to nD modeling, ITcon, 10, 15-16, 2005.
Au, Y., and Kauffman, R. J. The economics of mobile payments: understanding stakeholder issues for an emerging financial technology application. Electronic Commerce Research and Applications, 7, 2, 141–164, 2008.
Australian Built Environment Digital Modelling Working Group, “Issues Paper: Digital Modelling and the Built Environment” Built Environment Digital Modelling Working Group, Australia, 2009.
Australian Construction Industry Forum & Australian Procurement and Construction Council 2009, Integrated Project Teams And Building Information Modelling In The Australian Construction Industry, Draft V8.5, 5 March 2009.
Bazjanac, V., Impact of the U.S. National Builidng Information Model Standard (NBIMS) on Builidng Energy Performance Simulation, 2007.
Bedrick, J., Organizing the Development of a Building Information Model, AECbytes, 2008.
Bernstein, P. & Pittman, J., “Barriers to the adoption of Building Information Modeling in the Building Industry.” Autodesk Building Solutions White Paper, 2004.
Bresnen, M., Goussevskaia, A. & Swan, J., Implementing change in construction project organisations: Exploring the interplay between structure and agency. Building Research & Information, 33, pp. 547-560, 2005.
Cicmil, S. & Marshall, D., Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33, pp. 523-535, 2005.
Clark, T., and Stoddard, D. B., Interorganizational business process redesign: Merging technological and process innovation. Journal of Management Information Systems, 13, 2, 9–28, 1996.
Clason, J., Building Information Modeling: value for real estate developers and owners. BIM: value for real estate developers and owners, Master thesis, MIT, 2008.
Clemson, Definition of Policy, Clemson University — Office of Research Compliance, Definitions of Research Compliance Terms, 2007.
CRC for Construction Innovation October 2007, Final Report Business Drivers for BIM, Research Project No: 2005-033-C, 2007.
Davenport, T., “Process Innovation: reengineering work through information technology.” Harvard Business School Press, 1992.
Davenport, T.H., Process innovation. Boston, Mass.: Harvard Business School Press, 1993.
Davenport, T. H. The coming commoditization of processes. Harvard Business Review, 83, 6, 100–108, 2005.
Davenport, T.H., & Short, J.E., The new industrial engineering: Information technology and business process redesign. Sloan Management Review, 31, pp. 11-27, 1990.
Farrell, J., and Saloner, G. Standardization, compatibility and innovation. RAND Journal of Economics, 16, 1, 70–83, 1985.
Fellows R and Liu A, Research Methods for Construction, 2nd edition, Blackwell Publishing, UK, (chapter 1-5), 2003.
Finnish ProIT, 2004,
Fox, S. & Hietanen, J., “Interorganizational use of building information models: potential for automational, informational and transformational effects.” Construction Management and Economics, 25, 289-296, 2007.
Gu, N., Singh, V., Taylor, C., London, K. & Brankovic, L., “Building information modelling: an issue of adoption and change management.” ICAN Conference 2007, Sydney, Australia, 2007.
Haeussler, C. and Patzelt, H. Strategic alliances and product development in new technology firms: the moderating effect of technological capabilities, Babson Park, MA, 2008.
Haines, D. W., Letting ‘The System’ do the work: the promise and perils of computerization. The Journal of Applied Behavioral Science, 35(3), 306-24, 1999.
Hammer, M., & Champy, J., Reengineering the corporation: A manifesto for business revolution. New York: Harper Business, 1993.
Hammer, M., & Stanton, S., How process enterprises really work. Harvard Business Review, 77, pp. 108-118, 1999.
Hannon, J., Estimators’ functional role change with BIM. AACE International Transactions, IT.03, pp.1-8, 2007.
Hannus, J., Prosessijohtaminen: Ydinprosessien uudistaminen ja yrityksen suorituskyky. Espoo: HM & V Research, 1993.
Harty, C., Innovation in Construction: A sociology of technology approach. Building Research & Information, 33, pp. 512-522, 2005.
Henderson, K., On line and on paper: Visual representations, visual culture and computer graphics in design engineering, MIT Press, Cambridge, Mass, 1999.
Holsapple, C.W. and Joshi, K.D., Knowledge Management Ontology, in: D.G. Schwartz (Ed.), Encyclopedia of Knowledge Management, Idea Group Reference, pp. 397–402, 2006.
Jonassen, J., Changing business models in BIM-driven integrated practice, Report on integrated practice, American Institute of Architects, 2006.
Kauffman, R. & Tsai, J., With or without you: The countervailing forces and effects of process standardization, Electronic Commerce Research and Applications, 9, 305–322, 2010.
Kauffman, R. & Walden, E., “Economics and electronic commerce: Survey and directions for research.” International Journal of Electronic Commerce 5 (4) (2001), pp. 5–116, 2001.
Khemlani L., “CORENET e-PlanCheck: Singapore's Automated Code Checking System”, AECbytes Feature, AECBytes, 2005.
Khemlani, L., Technology Adoption and Implementation at HOK, AECbytes Feature, AECBytes, 2008.
Kiviniemi, M., “Building Information Model (BIM) promoting safety in the construction site process”, SafetyBIM – research project 10/2007 – 2/2009 (TurvaBIM in Finnish), Available at http://www.vtt.fi/files/projects/turvabim/turvabim_english.pdf.
Leicht, R., Fox, S., Mäkelainen, T. & Messner, J., “Building information models, display media and team performance: An exploratory study”, VTT Working Paper No. 88, 2007.
Keil, T. De facto standardization through alliances: Lessons from Bluetooth. Telecommunications Policy, 26, 3–4, 205–213, 2002.
Marquis, H., A Prescription for ITIL, 2006.
Maunula, A., The implementation of Building Information Modeling (BIM)- A process perspective. Helsinki University of Technology SimLab Publications, Report series 23, 2008.
Mooney, J.G., Gurbaxani, V. and Kraemer, K.L., A process orientated framework for assessing the business value of information technology, Advances in Information Systems, 27, 68–81, 1996.
Mutch, A., The impact of information technology on ‘traditional’ jobs: the case of welding. New Technology, Work and Society, 13, 140-9, 1998.
NBIMS, Transforming the Building Supply Chain Through Open and Interoperable Information Exchanges, Version 1- Part 1: Overview, Principles, and Methodologies, United States National Building Information Modeling Standard, National Institute of Building Sciences, 2007.
Penttila. H., “Introduction to BIM- What makes a BIM-project?” 2009, Available at http://www.mittaviiva.fi/hannu/BIM_project/index_bim_basics_en.html.
Permala, A., Kiviniemi, A., Sirkiä, A., Hiljanen, H., Granqvist, J. and Lehtinen, H., “Integrated Supply Chain Information Systems”, In Scientific Activities in Building and Construction 2008, pp. 66-67. VTT Annual Report, 2008.
Project Alliancing Practitioners’ Guide, Department of Treasury and Finance, Victoria, Australia, p.19, April 2006.
Quanjel, E., Otter, A. d. & Zeiler, W., Workshops as practicum’s to improve integration and knowledge exchange in collaborative design, CIB-W096, Taiwan, 2009.
Robson, C., Real World Research, 2nd edition, Blackwell Publishing, UK. (Part 1-3), 2002.
Senate Properties, Senate Properties BIM Guidelines, 2009, Available at http://www.senaatti.fi/document.asp?siteID=2&docID=588.
Smit, H. T. J., and Trigeorgis, L. Real options and games: Competition, alliances, and other applications of valuation and strategy. Review of Financial Economics, 15, 2, 95–112, 2006.
Succar, B., “Building information modelling framework: A research and delivery foundation for industry stakeholders.” Automation in Construction, 18, 357-375, 2009.
Succar, B., “The five components of BIM performance measurement.” CIBW096, CIB World Congress, Salford, UK, 2010.
Taylor, J., “The antecedents of successful 3D CAD implementation in design and construction networks.” J. Constr. Eng. Manage., 133(12), 993-1002, 2007.
Taylor, J. & Bernstein, P., “Paradigm Trajectories of Building Information Modelling Practice in Project Networks” Journal of Management in Engineering, ASCE, 69-76, 2009.
Taylor, J. & Levitt, R., “Understanding and managing systemic innovation inproject-based industries.” Innovations: Project management research 2004, Project Management Institute, Newton Square, Pa., 83-99, 2004.
Teo, A., Transforming Practices in the Real Estate and Construction Industry, Presented at BIM Guest Lecture, Taiwan, 24 Dec. 2009.
Teo, A. & Cheng, T., Building Smart - A Strategy for Implementing BIM Solution in Singapore, Synthesis Journal 2006, 5: 117-24, 2006.
Tilson, D., and Lyytinen, K. The 3G transition: Changes in the U.S. wireless industry. Telecommunications Policy, 31, 10–11, 569–586, 2006.
Varkonyi, V., “ ‘Thou Shalt Collaborate…’: Interdisciplinary Collaboration Strategies in the Age of BIM.” AECbytes Viewpoint, 43., 2009.
VTT, Virtual Building Environments II Final Project Report, 2007, Available at http://cic.vtt.fi/projects/vbe-net/data/VBE2_Final_Report.pdf.
Whyte, J., Bouchlaghem, N. & Thorpe, A., “IT implementation in the construction organization.” Eng., Constr., Archit. Manage., 9(5-6), 371-377, 2002.
Whyte, J., Bouchlaghem, N., Thorpe, A. & McCaffer, R., “A survey of CAD and virtual reality within the house building industry.” Eng., Constr., Archit. Manage., 6(4), 371-379, 1999.
Wong, A., Wong, F. & Nadeem, A., Comparative roles of major stakeholders for the implementation of BIM in various countries, 2009.
Yin, R. K., Case study research, design and methods, 3rd ed. Newbury Park: Sage Publications, 2003.