簡易檢索 / 詳目顯示

研究生: 蔡宗泊
Tsai, Tsung-Po
論文名稱: 高屏溪輸電鐵塔基礎沖刷安全性評估
The Safety Assessment Of Scouring On Power Transmission Tower Foundation In The Gaoping River
指導教授: 黃進坤
Huang, Chih-Sheng
學位類別: 碩士
Master
系所名稱: 工學院 - 水利及海洋工程學系碩士在職專班
Department of Hydraulic & Ocean Engineering (on the job class)
論文出版年: 2012
畢業學年度: 100
語文別: 中文
論文頁數: 136
中文關鍵詞: 輸電鐵塔實測流速局部沖刷安全警戒線
外文關鍵詞: power transmission tower, flow velocity, local scour, warning line
相關次數: 點閱:74下載:0
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報
  • 為了供應全台有穩定且充足的電力使用,台電公司設置輸電線網遍佈全台,其中必須跨越河川溪流,主要河川行水區通常達數百公尺甚至數公里,輸電線路無法直接跨越,則必須於行水區內設置輸電鐵塔,以利於輸送電力。
    本文利用高屏溪實測流速紀錄,統計分析研究範圍內平均流速與最大流速之關係,以求主深槽之最大流速,以做為局部沖刷深度計算之上游流速值。由國內外常用之局部沖刷深度公式,依研究範圍內之水文及地文資料,並篩選求出每座鐵塔基礎之局部沖刷深度。
    訂定輸電鐵塔基礎之安全性評估程序,將研究範圍內之基礎作安全性評估,並訂定鐵塔基礎之安全警戒線,使能定期檢查鐵塔基礎之安全性。

    Due to supplying stable power for people in Taiwan. The Taiwan Power Company builded power transmission lines all over the island and that had to crossed the river. The wide of the main river in Taiwan are often over hundreds of meters or even sevarel kilometers. The power transmission tower had to be builded in the river.
    The stady collected the flow velocity of The Gaoping River and had statistical analysis for the relation between average velocity and maximum velocity. According to the relation to calculated the local scour depth and finded the reasonable local scour depth formula to the stady. Calculated local scour depth of every power transmission tower foundation.
    Maked the safety assessment procedure of power transmission tower foundation, and assessed every tower foundation. Marked the safety warning line of the foundation,and checked the safety of foundation regularly.

    摘要I AbstractII 誌謝III 目 錄IV 表目錄VI 圖目錄VII 符號說明VIII 第一章 前言1 1.1 研究背景與目的1 1.2 研究流程及方法3 第二章 文獻回顧4 2.1 台電公司「輸電線路沉箱基礎安全預警及應變作業」工作程序書4 2.2 沖刷機制5 2.2.1 河川沖刷之特性5 2.2.2 局部沖刷型態6 2.2.3 橋墩周圍之水流型態8 2.3 局部沖刷公式10 2.3.1 橋墩沖刷因子10 2.3.2 局部沖刷深度公式11 第三章 研究區域選定及基本資料蒐集16 3.1 輸電鐵塔沉箱基礎基本資料16 3.1.1 輸變電工程介紹16 3.1.2 研究區域選定16 3.1.3 輸電鐵塔沉箱基礎基本資料搜集17 3.2 研究區域之google earth航照圖18 3.3 研究區域之水文及地文資料19 3.4 局部沖刷流速值採用20 3.4.1 實測流速統計分析20 3.4.2 各斷面流速值之採用21 第四章 鐵塔基礎安全性評估23 4.1 現有問題分析23 4.1.1 各沉箱基礎沖刷現況23 4.1.2 安全警戒線不足24 4.2 沖刷深度計算25 4.2.1 一般沖刷25 4.2.2 束縮沖刷26 4.2.3 局部沖刷深度計算26 4.3 輸電鐵塔基礎安全性評估28 4.4 安全警戒線之訂定30 4.5 處理對策31 第五章 結論與建議33 5.1 結論33 5.2 建議35 參考文獻37 附表39 附圖84 附錄114

    1.Coleman, N.L., “Analyzing Laboratory Measurements of Scour at Cylindrical Piers in Sand Beds”, Proc., 14th IAHR Congress, Vol. 3 (1971).
    2.Ettma, R., Mostafa, E.A., Melville, B.W., Yassin, A.A., “Local Scour at Skewed Piers”, Journal of Hydraulic Engineering, ASCE, Vol. 124(7), pp. 756-760 (1998).
    3.Hancu, S., “Sur Le Calcul des Affouillements Locaux Dams la Zone des Piles des Ponts”, Proc., 14th IAHR Congress, Paris France,Vol. 3, pp. 299-313 (1971).
    4.Inglis, C.C, The Behavior and Control of Rivers and Canals, Res. Pub. No. 13, Central Waterpower, Irrigation and Navigation Res. Sta. Poona, India (1949).
    5.Jain, S.C., Fischer, E.E., “Scour Around Bridge Piers at High Flow Velocities”, Journal of the Hydraulics Division, ASCE, Vol. 106 (1980).
    6.Jain, S.C., Maximum Clear-water Scour Around Cylindrical Piers”, Journal of Hydraulic Engineering, ASCE, Vol. 107(5), pp. 611-625 (1981).
    7.Laursen, E.M., “Scour at Bridge Crossings”, Bulletin No.8, Iowa Highway Research Board, Ames, Iowa, USA (1958).
    8.Laursen, E.M., “Scour at Bridge Crossings”, Transactions, ASCE, Vol.127, Part 1, pp116-119 (1962).
    9.Melville, B.W., “Pier and Abutment Scour-an Integrated Approach”, Journal of Hydraulic Engineering, ASCE, Vol. 123(2), pp. 125-136 (1997).
    10.Melvill, B., Coleman, S., “Workshop on Bridge Scouring”, Taipei, Sinotech Engineering Consultans Inc., 15~16 July, 1998.
    11.Neill, C.R., “River Bed Scour - a review for engineers”, Canadian Good Roads Association, Technical Publication No.23 (1964).
    12.Shen, H.W., Schneider, V.R., Karaki, S.S., “Mechanism of Local Scour”, Engineering Research Center, Colorado State Univ. Fort Collins, Colorado (1966).
    13.Shen, H.W., Schneider, V.R., Karaki, S.S., “Local Scour Around Bridge Piers”, Journal of the Hydraulics Divison, ASCE, Vol. 95, pp. 1919-1940 (1969).
    14.王文江,「認識河川」(2008)。
    15.台灣電力公司,「輸電工程作業手冊」,第1-1-8-53頁(1971)
    16.交通部運輸研究所,「本省西部重要河川橋梁橋基災害分析與橋基保護工法資料庫系統之建立」(1998)。
    17.交通部臺灣區國道新建工程局,「河川變遷、堤防保護與橋墩基礎型式選擇之整合研究」(2006)。
    18.朱宏翊,「筐網群結構物對橋墩沖刷保護效果之研究」,國立成功大學水利及海洋工程研究所碩士論文,黃進坤教授指導(2007)。
    19.吳建民,「橋墩沖刷之試驗研究」,水利復刊,第五期,第38-49頁(1967)。
    20.何泰源、吳文隆、蕭秋安、蔡立盛,「台灣河川橋梁基礎問題與案例介紹」,地工技術,第127期,第29-40頁(2011)。
    21.范文綱,「橋梁基礎局部沖刷監測與安全預警系統」,國立中央大學土木研究所碩士論文,王仲宇教授指導 (2009)。
    22.陳文欣、蕭志勝,「論輸變電工程在營建業的角色」,現代營建,第303期,第51頁(2005)。
    23.陳泳錦,「筐網群結構物對橋墩沖刷保護效果之研究」,逢甲大學水利工程與資源保育研究所碩士論文,王傳益教授指導 (2008)。
    24.經濟水利署第七河川局,「高屏溪(里港大橋至出海口)整體河性檢討之研究」(2006)。
    25.經濟水利署水利規劃試驗所,「高屏溪治理規劃檢討」(2008)。
    26.經濟部水利署,「申請跨河建造物設置注意事項」(2010)。
    27. 經濟部水利署,「申請跨河建造物設置注意事項」(2010)。
    28. 經濟水利署第七河川局,「高屏溪流域整體治理規劃」(2011)。

    無法下載圖示 校內:2014-09-06公開
    校外:不公開
    電子論文尚未授權公開,紙本請查館藏目錄
    QR CODE