| 研究生: |
安潔菈 Lam, Gabriela Elizabeth Andrade |
|---|---|
| 論文名稱: |
應用關鍵鏈方法於營建專案管理之研究 Framework for Adapting Critical Chain Methodology to Construction Project Management |
| 指導教授: |
馮重偉
Feng, Chung-Wei |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木工程學系 Department of Civil Engineering |
| 論文出版年: | 2012 |
| 畢業學年度: | 100 |
| 語文別: | 英文 |
| 論文頁數: | 103 |
| 外文關鍵詞: | critical path method, critical chain, construction project management |
| 相關次數: | 點閱:110 下載:1 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
For long time, the construction industry has handled project management under the well-known Critical Path Method (CPM), which was designed to be a comprehensive and easy-to-follow scheduling tool. CPM along with Gantt charts has developed to a point where most construction projects plans are based on it. However, despite of the widespread use of the CPM, construction projects still face the same problematic that has affected them for long time: delays.
Critical Chain Project Management (CCPM) addresses delays by the means of considering the variability and uncertainty due to the human behavior, against the CPM precepts which considers the manpower productivity to be fixed values, ignoring the fact that human behavior is what impacts –mostly in bad ways- the project performance. Currently, CCPM theory focuses only in time issues and it is intended to be applied to any kind of project. But in order to make this methodology more practical and comprehensive for construction project management, this research presents a framework to adapt CCPM to the scenario of construction, by considering the conditions involved in the planning stage from the point of view of a general contractor, and encouraging subcontractors to adopt the methodology by the incorporation of a bonus system, which works within the project budget constraints, and a penalty system as well, to avoid delays. A case study will be used to show the guidelines described in this framework, to produce a smoother and more practical transition from the CPM to CCPM in construction projects.
Bevilacqua, M., Ciarapica, F., & Giacchetta, G. (2009). Critical Chain and risk analysis applied to high-risk industry maintenance: A case study. International Journal of Project Management(27), 419-432.
Chan, D. W., & Kumaraswamy, M. M. (2002). Compressing Construction Durations: lessons learned from Hong Kong building projects. International Journal of Project Management(20), 23-35.
Cohen, I., Mandelbaum, A., & Shtub, A. (2004). Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives. Project Management Journal, 35(2), 39-50.
Dilmaghani, F. (2008). Critical Chain Project Management (CCPM) at Bosch Security Systems (CCTV) Eindhoven. Master of Science Thesis. University of Twente.
Givens Filiatrault, C. L., & Peterson, C. D. (2000). Five behaviors that can reduce schedule risk. Proceedings of the Project Management Institute Annual Seminars & Symposium. Houston, Texas, USA.
Goldratt, E. M. (1997). Critical Chain. Great Barrington, Massachusetts: The North River Press Publishing Corporation.
Goldratt, E. M. (2004). The Goal (3rd Revised Edition ed.). Great Barrington, Massachusetts: The North River Press Publishing Corporation.
Herroelen, W., & Leus, R. (2001). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management(19), 559-577.
Herroelen, W., Leus, R., & Demeulemeester, E. (2002). Critical Chain Project Scheduling: Do not oversimplify. Project Management Journal, 33(4), 48-60.
Hinze, J. W. (2008). Construction Planning and Scheduling (Third ed.). Pearson Prentice Hall.
Kendall, G. I., Pitagorsky, G., & Hulett, D. (2001). Integrating Critical Chain and the PMBOK Guide. International Institute for Learning, Inc., 1-21.
Leach, L. P. (1999). Critical Chain Project Management Improves Project Performance. Project Management Journal, 30(2), 39-51.
Leach, L. P. (2005). Critical Chain Project Management (2nd ed.). Boston: Artech House.
Lechler, T. G., Ronen, B., & Stohr, E. A. (2005). Critical Chain: A new Project Management Paradigm or Old Wine in New Bottles? Engineering Management Journal, 17(4), 45-58.
Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in developing countries: a case study from Vietnam. International Journal of Project Management(22), 553-561.
Mansfield, N. R., Ugwu, O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management(12), 254-260.
O'Brien, J. J., & Plotnick, F. L. (1999). CPM in Construction Management (Fifth ed.). McGraw-Hill, Inc.
Project Management Institute. (2008). PMBOK Guide (Fourth ed.). Project Management Institute, Inc.
Rand, G. K. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management(18), 173-177.
Rogalska, M., & Hejducki, Z. (2007). Time buffers in construction process scheduling. Journal of Civil Engineering and Management, 13(2), 143-148.
Shou, Y., & Yeo, K. T. (2000). Estimation of project buffers in critical chain project management. International Conference on Management of Innovation and Technology. 1, pp. 162-167. IEEE.
Steyn, H. (2000). An investigation into the fundamentals of critical chain scheduling. International Journal of Project Management(19), 363-369.
Steyn, H. (2002). Project management applications of the theory of constraints beyond critical chain scheduling. International Journal of Project Management(20), 75-80.
Sweis, G., Sweis, R., Abu, H. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management(26), 665-674.
Tukel, O. I., Rom, W. O., & Eksioglu, S. D. (2006). An investigation of buffer sizing techniques in critical chain scheduling. European Journal of Operational Research(172), 401-416.
Van de Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2005). The use of buffers in project management: The trade-off between stability and makespan. International Journal of Production Economics(97), 227-240.
Vrîncuţ, M. (2009). Critical Chain Project Management and the Construction Industry in Romania. Review of International Comparative Management, 10(5), 1060-1067.
Watson, K. J., Blackstone, J. H., & Gardnier, S. C. (2007). The evolution of a management philosophy: The theory of constraints. Journal of Operations Management(25), 387-402.
Wei, C.-C., Liu, P.-H., & Tsai, Y.-C. (2002). Resource-constrained project management using enhanced theory of constraint. International Journal of Project Management(20), 561-567.
Xie, X.-M., Yang, G., & Lin, C. (2010). Software development projects IRSE buffer settings and simulation based on critical chain. The Journal of China Universities of Posts and Telecommunications, 17(Supplement), 100-106.
Yang, J.-B. (2007). How the Critical Chain Scheduling Method is Working for Construction. Cost Engineering, 49(4), 25-32.