簡易檢索 / 詳目顯示

研究生: 曾音雅
Tseng, Yin-Ya
論文名稱: 平行震測法應用於基樁長度檢測之實驗研究
The Evaluation of Embedded Length of Pile Using Parallel Seismic Testing
指導教授: 倪勝火
Ni, Sheng-Huoo
學位類別: 碩士
Master
系所名稱: 工學院 - 土木工程學系
Department of Civil Engineering
論文出版年: 2010
畢業學年度: 98
語文別: 中文
論文頁數: 139
中文關鍵詞: 基樁平行震測法非破壞性檢測完整性檢測
外文關鍵詞: pile, parallel seismic method, nondestructive testing, integrity test
相關次數: 點閱:127下載:1
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報
  • 運用非破壞性檢測技術以評估基樁之完整性及施工品質已是趨勢。平行震測法是非破壞檢測制式規定方法之一。然而,使用平行震測法之相關研究較少。本研究之目的是探討利用平行震測法檢測基樁長度的準確性。本研究利用現場植入之預製不同缺陷大小之PC樁為試驗樁,各別進行完整樁及缺陷樁之檢測。研究方法係利用量測基樁各深度與傳播初始速度之時間振幅圖再進行分析。結果顯示,量測樁長與實際樁長相符,預製之缺陷在本方法時域資料無法有效判讀。

    Using nondestructive testing to evaluate the integrity and construction quality of newly-built piles become a routine regulation. Parallel seismic (PS) method is one of nondestructive testing methods. However, there are limited studies of parallel seismic method used for this purpose. The purpose of this study is to check the accuracy of the length evaluation of a pile by using the parallel seismic test method. In this study the precast piles are pre-constructed with different size of defects in the pile. The impulse hammer hits the pile head, the echo signals is used to determine the initial arrival time of each depth. The length of pile is evaluated from the initial arrival time. The results show that the length of pile obtained from using PS method is matched well with the actual length of pile. But the defect of piles is difficult to be detected by this method.

    摘要 I Abstract II 誌謝 III 目錄 IV 表目錄 VII 圖目錄 VIII 符號說明 XI 第一章 緒論 1 1.1 研究動機 1 1.2 研究目的與方法 6 1.3 研究內容 7 第二章 文獻回顧 8 2.1 前言 8 2.2 基樁非破壞性檢測方法之回顧 9 2.3 相關研究之文獻回顧 18 第三章 相關理論 23 3.1基本波傳理論 23 3.2基樁波傳理論 29 3.2.1邊界條件 30 3.2.2基樁不連續面 32 3.3平行震測法之原理介紹 38 第四章 基樁現地試驗 42 4.1前言 42 4.2試驗地點 43 4.2.1現場鑽探土壤分析結果 45 4.3基樁設計缺陷 49 4.4試驗儀器與設備 52 4.5試驗方法與步驟 60 4.6試驗分析結果討論 65 4.6.1平行震測法基樁長度之試驗結果 66 4.6.2平行震測法與穩態振動法之基樁長度試驗比較 74 4.6.3平行震測法基樁缺陷之試驗結果 76 4.6.4平行震測法與穩態振動法之基樁缺陷試驗比較 79 第五章 結論與建議 81 5.1結論 81 5.2建議 82 參考文獻 83 附錄A測試井B3地下土層調查分析結果 87 附錄B現地基樁量測震波檢測記錄 93

    1. Bolt, B. A., Earthquakes, W. H. Freeman, New York, 331p. (1993).
    2. Davis, A.G., and Dunn, C.S., “From Theory to Field Experience with the Non-destructive Vibration Testing of piles,” Proc. Inst. Civil Eng., Part 2, 57, pp. 571-593 (1974).
    3. Google Earth。取自:http://earth.google.nl/index.html
    4. Hartung, M., Meier K., and Rodatz, W., “Integrity Testing on Model Pile,” Proc. 4th Int. Conference on the Application of Stress-Wave Theory to Pile, Barends, F. B. J. Ed., Hague, Netherlands, Balkema, Rotterdam, pp. 265-271 (1992).
    5. Huang, D.Z., and Chen, L.Z., “Studies on Parallel Seismic Testing for Integrity of Cemented Soil Columns,” Journal of Zhejiang University SCIENCE A, Vol. 8, No. 11, pp 1146-1753 (2007).
    6. Li, D.Q., Zhang, L.M., and Tang, W.H., “Reliability Evaluation of Cross-Hole Sonic Logging for Bored Pile Integrity,” Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 131,No. 9, pp 1130-1138 (2005).
    7. Li, D.Q., Tang, W.H., and Zhang, L.M. “Updating Occurrence Probability and Size of Defect for Borde Piles” Structural Safety, Elsevier, Vol. 30, Issue 2, pp 130-143 (2008).
    8. Liao, S.T., “Nondestructive Testing of Piles,” Ph.D. Dissertation, Department of Civil Engineering, University of Texas, Austin, Texas, pp. 20-120 (1994).
    9. Liao, S.T. and Roesset, J.M., “Identification of Defects in Piles through Dynamic Testing,” International Journal for Numerical and Analytical Methods in Geomechanics, Vol. 21, Issue 4, pp. 277-291 (1997).
    10. Liao, S.T., Tong, J.H., Chen, C.H., and Wu, T.T. “Numerical Simulation of Nondestructive Parallel Seismic Test for Piles,” International Journal of Solids and Atructures, Vol. 43, Issues 7-8, pp. 2279-2298 (2006).
    11. Richart, F.E., Jr., “Foundation Vibrations,” Trans. ASCE, Vol. 127, Part1, pp. 863-898 (1962).
    12. Sack, D.A., Slaughter, S.H., and Larry D. Olson, “Combined Measurement of Unknown Foundation Depths and Soil Properties with Nondestructive Evaluation Methods,” Journal of the Transportation Research Board, No. 1868, TRB, pp 76-80, (2004).
    13. Schellingerhout, A.J.G., “Quantifying Pile Defects by Integrity Testing,” Proceedings of the Fourth International Conference on the Application of Stress Wave Theory to Piles, Baldema, Rotterdam, Brookfield, September, pp. 319-324 (1992).
    14. Steinbach, J., and Veye, E., “Caisson Evaluation by Stress Wave Propagation Method,” Journal of the Geotechnical Engineering Division, ASCE, Vol. 101, No. GT4, pp.361-387 (1975).
    15. TNO Building and Construction Research, Foundation Pile Diagnostic System, Sonic Integrity Testing, Netherlands (1997).
    16. Woods, R. D., “Screening of Surface Waves in Soils,” J. Soil Mech. and Found. Div., Proc. ASCE, Vol. 94, No. SM 4, July, pp. 951-979 (1968).
    17. 王弘義,「基樁應力波非破壞檢測技術之比較評估」,碩士論文,朝陽科技大學營建工程系(2003)。
    18. 王景信,「平行震測法與超震波法在實務上之應用研究」,碩士論文,成功大學土木工程學系(2006)。
    19. 余文裕,「在樁帽與群樁效應下檢測基樁長度之理論與實驗研究」,碩士論文,中華大學土木工程學系(2001)。
    20. 余柏宏,「獨立模型基樁完整性檢測訊號之比較評估」,碩士論文,朝陽科技大學營建工程系(2006)。
    21. 吳天珦,「音波回音法應用於基樁完整性檢測之實驗研究」,碩士論文,成功大學土木工程學系(2009)。
    22. 李俊男,「脈波反應法應用於基樁之模擬與分析」,碩士論文,國立成功大學土木工程研究所(2005)。
    23. 李允仲,「穩態振動法應用於探測基樁長度之實驗研究」,碩士論文,成功大學土木工程學系(2009)。
    24. 沈冠男,「現地全尺寸缺陷基樁之敲擊反應檢測值與數值模式結果之比較」,碩士論文,中華大學土木工程學系(1999)。
    25. 林明勳、廖述濤,「無樁帽單樁與含樁帽群樁之非破壞檢測案例研究」,台灣公路工程,第30卷,第6期,第2-18頁(2003)。
    26. 倪勝火,「基樁的破壞性檢測與案例」,地工技術雜誌,第52期,第49-62頁(1995)。
    27. 陳政豪,「基樁之平行震測法與超震測法之研究」碩士論文,中華大學土木工程學系(1998)。
    28. 陳政豪、廖述濤,「以平行震測法檢測基樁完整性之研究」,建築物防災檢測與補強技術研討會論文集,土木工程與防災科技研討會,第155-168頁(1998)。
    29. 傅國倫,「多重缺陷基樁之非破壞性檢測法之初步研究」,碩士論文,中華大學土木工程學系(1999)。
    30. 嵇少丞,「地震中倒塌的彭州小魚洞斷橋」,(2008)。取自:http://www.sciencenet.cn/m/user_content.aspx?id=50430
    31. 廖述濤、倪勝火、傅國倫,「基樁非破壞性之檢測與評估」,檢測科技,第十七卷,第三期,第97-119頁(1999)。
    32. 賴俊仁、餘志鵬、王弘義,「應力波法應用於現有橋梁基樁完整性檢測之研究」,第十屆大地工程學術研究討論會論文集,台灣三峽(2003)。
    33. 賴正昇,「脈波回音法應用於基樁之模擬與分析」,碩士論文,碩士論文,成功大學土木工程學系(2006)。
    34. 謝旻勳,「獨立基樁非破壞性檢測訊號之研究」,碩士論文,朝陽科技大學營建工程系(2004)。

    下載圖示 校內:立即公開
    校外:2011-08-12公開
    QR CODE