| 研究生: |
高逸耀 Kao, Kevin |
|---|---|
| 論文名稱: |
Orders Assignment and Scheduling in International Plants–Using Simulated Annealing Approach Orders Assignment and Scheduling in International Plants–Using Simulated Annealing Approach |
| 指導教授: |
吳植森
Wu, Chih-Sen |
| 學位類別: |
碩士 Master |
| 系所名稱: |
管理學院 - 國際管理碩士在職進修專班(IMBA) International Master of Business Administration(IMBA) |
| 論文出版年: | 2006 |
| 畢業學年度: | 94 |
| 語文別: | 英文 |
| 論文頁數: | 79 |
| 外文關鍵詞: | multi-plant orders assignment model, optimal production scheduling, empirical result, simulated annealing algorithm |
| 相關次數: | 點閱:74 下載:0 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
The purpose of this research is to minimize production cost by developing a multi-plant orders assignment model. This model is considered under some restrictions in orders to have an optimal orders assignment to suitable overseas plants.
How to plan an optimal production scheduling after orders assignment is another point of this research. A heuristics algorithm, which is simulated annealing approach, is considered and used to minimize total manufacturing cost.
The orders assignment model is developed for a fasteners manufacturer, the database of this research is from the enterprise. The production scheduling of this enterprise is planned by empirical result. Empirical result is not a systematic approach; this model offers a better choice for orders assigning and scheduling.
Although simulated annealing approach can not guarantee theoretical optimal solutions, most tested problems satisfied field planner under the consideration of algorithmic tractability.
Adenso-Díaz, B. (1996). An SA/TS mixture algorithm for the scheduling tardiness problem. European Journal of Operational Research, 88, 516-524.
American Society for Testing and Materials (2003). Fasteners; Rolling Element Bearings, Section 1, Vol. 01.08, ASTM International, Pennsylvania.
Baker, E. & Schaffer, J. R. (1986). Solution Improvement Heuristics for the Vehicle Routing and Scheduling Problem with Time Window Constraints. American Journal of Mathematical and Management Sciences, 6, 261-300
Beranrd, A., Philippe, C. & Nicolas, M. (2003). Robustness Evaluation of Multisite Distributed Schedule with Perturbed Virtual Jobshops. Production Planning and Control, 14, 55-67.
Dechter, R. & Pearl, J. (1985). Generalized Best-first Search Strategies and the Optimality of A*. J.ACM, 32(3).
Dueck, G. & Scheuer, T. (1990). Threshold Accepting: A General Purpose Optimization Algorithm Appeared Superior to Simulated Annealing. Journal of Computational Physics, 90, 161-175.
Deutches Institut für Normung e.V. (2003). Fasteners 1~5, 5th Edition, DIN, German.
Glover, F. (1990). Tabu search-Part I. ORSA Journal on Computing, 1, 4-32.
Glover, F. (1990). Tabu search-Part II. ORSA Journal on Computing, 2, 4-32.
Hisao, I., Shinta, M., & Hideo T. (1995). Modified simulated annealing algorithms for the flow shopsequencing problem. European Journal of OperationalResearch , 81, 388-398.
Holland, J. H. (1975). Adaptation in natural and Artificial System. Ann Arbor: University of Michigan Press.
Industrial Fasteners Institute (2003). Inch Fastener Standards 7th edition, IFI, Ohio.
International Organization for Standardization (1998). Fasteners and screw Threads, 1&2, ISO Central Secretariat, Switzerland.
Jayaraman, V. & Pirkul, H. (2001). Planning and Coordination of Production and Distribution Facilities for Multiple Commodities. European Journal of Operational Research, 133, 394-408.
Kingsman, B., Hendry, L., Mercer, A. & de Souza, A.(1996). Responding to Customer Enquires In Make-to-Order Companies Problems and Solutions. International Journal of Production Economics, 46-47, 219-231.
Kirkpatrick, S., Gelatt, C. D. & Vecchi, M. P. (1983). Optimization by Simulated Annealing. Science, 220(4598), 671-680.
Koulams, C., Antony, SR. & Jaen, R. (1994). A Survey of Simulated Annealing Applications to Operations Research Problems. Omega, 22(1), 41-56.
Markland, R. E., Darby-Dowman, K. H. & Minor, E. D. (1990). Coordinated Production Scheduling for Make-to-Order Manufacturing. European Journal of Operational Research, 45, 155-176.
Pirkul, H. & Jayaraman, V. (1998). A Multi-commodity, Multi-plant, Capacitated Facility Location Problem: Formulation and Efficient Heuristic Solution. Computers Ops. Res., 25(10), 869-878.
Sambasivan, M. & Schmidt, C. P. (2002). A Heuristic Procedure for Solving Multi-plant, Multi-item, Multi-period Capacitated Lot-sizing Problems. Asia-Pacific Journal of Operational Research, 19, 87-105.
Sauer, J., Suelmann, G. & Appelrath, H. (1998). Multi-site Scheduling with Fuzzy Concepts. International Journal of Approximate Reasoning, 19, 145-160.
Timpe, C. H. & Kallrath, J. (2000). Optimal Planning In Large Multi-site Production Networks. European Journal of Operational Research, 126, 422-435.
Watson, K. & Polito, T. (2003). Comparison of DRP and TOC Financial Performance within A Multi-production, Multi-echelon Physical Distribution Environment. International Journal of Production Research, 41, 741-765.
Wu, J. (2005). Journal of Taiwan Industrial Fasteners Institute, 219, 19.
Wu, J. (2005). Journal of Taiwan Industrial Fasteners Institute, 221, 14-15.