  • BIM “Building Information Modeling” has been promoted in the AEC industry for being the core technology of various rich information applications, through which large amount of data is stored and handled along a process. For example Architects have used it to optimize the streamline of information throughout the design phase of a project, Structural and MEP Engineers have used BIM as a database for their design projects and Cost Engineers use it to automatically and dynamically calculate quantity takeoffs. Although BIM has contributed to different sectors in the AEC industry individually, it still hasn’t been exploited to offer information management solutions for the construction management phase of a Project.
    This study presents a new information model under the name of the Information Integration Sphere “IIS” to fill in the gap of data transition from the design to the construction phase using BIM technologies, by synchronizing the different stakeholder’s information requirements throughout the project. It serves as a tool to better generate, manipulate and visualize the flow of information along different processes and mechanisms (stakeholders). Besides offering an efficient streamline of information, it also helps establish the responsibilities and data requirements among the various stakeholders of the project.
    A case study will be used to show the benefits of the IIS in managing the information of a project using BIM technologies and laying the path for a smoother transition of data flow between the different stages of the project’s lifecycle.

    ACKNOWLEDGEMENTS I ABSTRACT II TABLE OF CONTENTS III LIST OF TABLES VI LIST OF FIGURES VII CHAPTER 1 INTRODUCTION 1 1.1 Research Background and Overview 1 1.2 Motivation of the Research 3 1.3 Objectives and Scope 4 1.4 Research Procedure 5 1.5 Thesis Structure 7 CHAPTER 2 LITERATURE REVIEW 9 2.1 Problem Statement 9 2.2 BIM Approach 12 2.2.1 BIM Concept and Technology 13 2.2.2 Benefits of using BIM 17 2.2.3 Issues and barriers for BIM implementation 18 2.3 Current Project Delivery Methods 19 2.3.1 Design-bid-build 19 2.3.2 Design-build 20 2.3.3 CM-at-risk 20 2.3.4 Integrated Project Delivery 20 2.3.5 Summary and Overview 21 2.4 BIM Frameworks and Guidelines 21 2.4.1 BIM Implementation Frameworks 22 2.4.2 BIM Implementation Guidelines 24 2.5 Summary of the Literature Review 26 CHAPTER 3 RESEARCH METHODOLOGY 28 3.1 The IIS Concept 28 3.2 The IIS Components 29 3.2.1 Timeline 30 3.2.2 Processes 31 3.2.3 Stakeholder 31 3.2.4 Data Flow 32 3.3 The IIS Deliverables 33 3.3.1 Time Perspective 33 3.3.2 Stakeholder Perspective 34 3.3.3 Process Perspective 34 3.3.4 Interaction Points Perspective 35 3.4 STEPS TO BUILD AN IIS 36 3.4.1 Step 1: Identify BIM Objectives Timeline and Stakeholders 36 3.4.2 Step 2: Define BIM Processes 38 3.4.3 Step 3: Define Information Exchanges. 42 3.4.4 Step 4: Identify IIS deliverables and products 45 CHAPTER 4 RESULTS AND VERIFICATIONS 52 4.1 Introduction 52 4.2 Case Study Description 54 4.2.1 Technical Information 54 4.2.2 Budget and Payments 55 4.2.3 Schedule 56 4.3 Developing the IIS 59 4.3.1 Step 1: Identify BIM Objective, Timeline and Stakeholders 59 4.3.2 Step 2: Define BIM Processes. 61 4.3.3 Step 3: Define Information Exchanges 62 4.3.4 Step 4: Identify IIS deliverables and products 67 4.4 The Construction Management – Ready BIM Model 76 4.4.1 The Process of building the BIM model 76 4.4.2 Input of IIS data attributes into the BIM model 78 CHAPTER 5 CONCLUSIONS 82 5.1 Results Verifications 82 5.2 Conclusions 83 5.3 Future Research 84 REFERENCES 85 APPENDICES 90 Appendix 1: Typical architectural blueprint of the case study 90 Appendix 2: Typical section of the case study 91 Appendix 3: Typical structural blueprint of the case study 92 Appendix 4: Location-based schedule of the case study 93

    1. ANSI. & PMI. (2007). A Guide to the Project Management Body of Knowledge: PMBOK Guide: Project Management Institute, Inc.
    2. Autodesk, Parametric building modeling: BIM’s foundation, (2007)
    http://images.autodesk.com/adsk/files/bim_parametric_building_modeling_jan07 _1_.pdf
    3. Autodesk Revit. "BIM and Cost Estimating.” Press release. Jan. (2007).
    http://images.autodesk.com/adsk/files/bim_cost_estimating_jan07_1_.pdf
    4. Azhar, S., Hein, M., & Sketo, B. (2010). Building information modeling (BIM): Benefits, risks and challenges. Mc Whorter School of Building Science, Auburn University, Alabama.
    5. Bernstein, P. G., & Pittman, J. (2005). Barriers to the adoption of building information modeling in the building industry. Autodesk Building Solutions Whitepaper, Autodesk Inc., CA.
    6. Bidgoli, H. (2004). The Internet Encyclopedia (Vol. 1): John Wiley & Sons Inc.
    7. Dawood, N., & Mallasi, Z. (2006). Construction workspace planning: assignment and analysis utilizing 4D visualization technologies. Computer Aided Civil and Infrastructure Engineering, 21(7), 498-513.
    8. Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors: Wiley.
    9. Eastman, C. M. (1999). Building product models: computer environments supporting design and construction: CRC.

    10. Eckblad, S., Ashcraft, H., Audsley, P., Blieman, D., Bedrick, J., Brewis, C., et al. (2007). Integrated Project Delivery-A Working Definition. AIA California Council, Sacramento, CA.
    11. Fallon, K. K., & Palmer, M. E. (2007). General Buildings Information Handover Guide: Principles, Methodology and Case Studies (NISTIR 7417): August.
    12. Feng, C. W., Chen, Y. J., & Huang, J. R. (2010). Using the MD CAD model to develop the time-cost integrated schedule for construction projects. Automation in Construction, 19(3), 347-356.
    13. Fischer, M., & Kunz, J. (2004). The scope and role of information technology in construction.
    14. Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction.
    15. Guide, American General Contractors A. G. C. (2006). AGC Contractors's Guide to BIM.
    16. Guide, Computer Integrated Construction Research Program C.I.C. (2010). BIM Execution Planning Guide
    17. Hardin, B. (2009). BIM and construction management: Wiley Publishing.
    18. Jongeling, R., Kim, J., Fischer, M., Mourgues, C., & Olofsson, T. (2008). Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models. Automation in Construction, 17(6), 780-791.
    19. Jongeling, R., & Olofsson, T. (2007). A method for planning of work-flow by combined use of location-based scheduling and 4D CAD. Automation in Construction, 16(2), 189-198.
    20. Jung, Y., & Joo, M. (2010). Building information modelling (BIM) framework for practical implementation. Automation in Construction.

    21. Kang, J. H., Anderson, S. D., & Clayton, M. J. (2007). Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of construction engineering and management, 133, 447.
    22. Khanzode, A., Fischer, M., & Reed, D. (2008). Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project: ITcon.
    23. Khemlani, L. (2006). Visual Estimating: Extending BIM to Construction. AECbytes http://www. aecbytes. com/buildingthefuture/2006/VisualEstimating.html.
    24. Kiviniemi, A., Tarandi, V., Karlshoj, J., & Karud, O. (2008). Review of the development and implementation of IFC compatible BIM. Erabuild Project Report.
    25. Kiviniemi, A., Fischer, M., Bazjanac, V., & Paulson, B. (2006). Requirements Management Interface to Building Product Models: Problem Definition and Research Issues: CIFE Working Paper, out., 2004. Stanford University.
    26. Kunz, J., & Fischer, M. (2007). Virtual design and construction: themes, case studies and implementation suggestions. Stanford Center for Integrated Facility Engineering.
    27. Kymmell, W. (2007). Building information modeling: planning and managing construction projects with 4D CAD and simulations: McGraw-Hill Professional.
    28. LAL, M. E. (2007). The quest for integrated design system: a brief survey of past and current efforts. METU JFA, 2.
    29. Le, M., Mohus, F., Kvarsvik, O., & Lie, M. (2006). The HITOS project—a full scale IFC test, ework and ebusiness in architecture.

    30. Lee, A., Ponting, A., Aouad, G., Wu, S., Koh, I., Fu, C., et al. (2003). Developing a vision of nD-enabled construction, 3D to nD modelling project. University of Salford, UK.
    31. Lee, G., Sacks, R., & Eastman, C. M. (2006). Specifying parametric building object behavior (BOB) for a building information modeling system. Automation in Construction, 15(6), 758-776.
    32. Lee, H., Lee, Y., & Kim, J. (2008). A cost-based interior design decision support system for large-scale housing projects. ITcon, 13, 20-38.
    33. Leventhal, L. (2001). Delivering instructions for inherently-3D construction tasks: lessons and questions for universal accessibility.
    34. Linderoth, H. C. J. (2010). Understanding adoption and use of BIM as the creation of actor networks. Automation in Construction, 19(1), 66-72.
    35. Liu, X., & Akinci, B. (2009). Requirements and Evaluation of Standards for Integration of Sensor Data with Building Information Models. Paper presented at the ASCE, Austin, Texas.
    36. Manning, R., & Messner, J. (2008). Case studies in BIM implementation for programming of healthcare facilities: ITcon.
    37. Moum, A., Koch, C., & Haugen, T. I. (2009). What did you learn from practice today? Exploring experiences from a Danish R&D effort in digital construction. Advanced Engineering Informatics, 23(3), 229-242.
    38. NBMIS, National Building Information Modeling Standards, Version 1 2007.
    39. Penttilä, H. (2006). Describing the changes in architectural information technology to understand design complexity and free-form architectural expression: ITcon.
    40. Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L., & Mikalauskas, S. (2010). The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Automation in Construction, 19(3), 357-367.
    41. Russell, A. D., & Udaipurwala, A. (2000). Assessing the quality of a construction schedule.
    42. Series, G. S. A. B. I. M. G. (2007). GSA.
    43. Singh, V., Gu, N., & Wang, X. (2010). A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Automation in Construction. 134-144.
    44. Staub-French, S., & Khanzode, A. (2007). 3D and 4D modeling for design and construction coordination: issues and lessons learned. ITcon, 12, 381–407.
    45. Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3), 357-375.

    下載圖示 校內:2015-09-06公開
    校外:2013-09-06公開
    QR CODE