| 研究生: |
謝宗霖 Hsien, Tsung-lin |
|---|---|
| 論文名稱: |
橋梁之最佳生命週期維護 Optimal Life-Cycle Maintenance Planning of Bridges |
| 指導教授: |
潘南飛
Pan, Nang-Fei |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木工程學系 Department of Civil Engineering |
| 論文出版年: | 2009 |
| 畢業學年度: | 97 |
| 語文別: | 中文 |
| 論文頁數: | 80 |
| 中文關鍵詞: | 橋梁維護 、生命週期 、模糊規劃 、模糊排序法 |
| 外文關鍵詞: | Life cycle, Bridge maintenance, Fuzzy programming, Fuzzy ranking method |
| 相關次數: | 點閱:98 下載:2 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
在交通路網建設已驟完善的今天,交通工程的重點逐漸由新建工程轉變為以維護管理為主要目的,然而以生命週期為導向的維護規劃分析年期長,且由於營建產業的特性(天候、物價波動等),造成維護成本難以精確估計。本研究建構一易於求解的橋梁構件維護規劃模式;以最小化生命週期總維護成本為目標並考量模糊預算上限且當維護成本為模糊數值時,其總維護成本亦為模糊數值。先以Yager 排序法(Ranking method)將模糊維護成本係數及模糊預算上限係數排序,轉為明確的數值,再利用傳統數學規劃模式來求解。並依橋梁管理者的需求,建構單一構件、專案層級及路網層級的模式,提供橋梁管理者在不同的情況下作為維護決策的參考。
With the completion of traffic network, the focus of traffic engineering has shifted from new building construction to maintenance management. However, the term of analysis on maintenance plan based on life-cycle orientation become long, it leads to hardly estimate the cost of maintenance. To minimize the life cycle of maintenance cost, if the maximum of budget and total maintenance cost are taken into consideration as fuzzy
value, the total maintenance cost will be fuzzy value as well.
This study constructs bridge component maintenance programming model easy to slove. The Yager’s ranking method is used to transform the fuzzy maintenance cost and
fuzzy budget into crisp value, and then the optimal approach can be determined via the classical mathematical programming model. According bridge manager demand constructs single component、project level and network level, provided to the bridge manager as the reference to make decision in different situation.
一、中文文獻
1. 台灣地區橋梁管理系統,交通部運輸研究所,(http://bms.iot.gov.tw)。
2. 高速公路局年報,高速公路局,民國91 年。
3. 高速公路橋梁一般目視檢測手冊,中華民國交通部台灣區國道高速公路局,民國
84 年12 月。
4. 公路總局網站統計年報,(http://www.thb.gov.tw),民國91 年。
5. 王國琛,「結合限制規劃與數學規劃求解大型後艙空勤組員排班問題」,國立交通
大學,,2002。
6. 林安彥,李有豐,橋梁檢測評估與補強,全華科技圖書股份有限公司,2000。
7. 姚志銘,「熱浸鍍鋅鋼橋生命週期成本模式建立之研究」,逢甲大學,2007。
8. 張浚威,「模糊線性規劃方法之比較分析」,國立台灣大學碩士論文,1999。
9. 許鎧麟,黃榮堯,橋梁生命週期成本評估方法與結構使用年限之建立(2/2), 財
團法人台灣營建研究院,2003。
10. 連夷佐,「橋梁維護管理生命週期成本評估模式之研究」,國立中央大學,2003。
11. 陳威廷,「生命週期導向橋梁評估系統之研究」,國立中央大學,2004。
12. 黃薰毅,「橋梁構件共同維護模式之建構」,國立雲林科技大學,2007。
13. 葉啟章,建立台灣地區橋梁管理系統研商會議講義,2000。
14. 袁新生,邵大宏,郁時燦,LINGO 和Excel 在數學建模中的應用,科學出
版社,2007。
二、英文文獻
1. “Life-Cycle Cost Analysis Primer.”, U.S. Department of Transportation, Federal
Highway Administration Office of Asset Management, August 2002.
2. Al-Hajj, A., “Modelling running and maintenance costs for life cycle costing
applications in buildings.”, Durability of Building Materials and Components 8,
1699-1706, 1999.
3. ArIkan, F. and Zulal G., “An application of fuzzy goal programming to a multiobjective
project network problem.”, Fuzzy Sets and Systems, 119(1), 49-58, 2001.
4. Bellman, R.E. and Zadeh, L.A., “Decision Making in a fuzzy environment.”,
Management Science, 17, 141-164, 1970.
5. Cadenas, J.M. and Verdegay, J.L., “Using fuzzy numbers in linear programming.”, IEEE
Trans. Syst., Man, Cybern, 27, 1016- 1022, 1997.
6. Chen, S.J. and Hwang, C.L. eds, “Fuzzy Multiple Attribute Decision Making.”,
Springer-Verlag, New York, 1992.
7. Hegazy, T., Elbeltagi, E. and El-Behairy, H., “Bridge Deck Management System with
Integrated Life-Cycle Cost Optimization.”, Journal of the Transportation Research
Board, 1866, 44-50, 2004.
8. Herrera, F. and Verdegay, J.L., “Three models of fuzzy integer linear programming”,
European Journal of Operational Research, 83(3), 581-593, 1995.
9. Herrera, F. and Verdegay, J.L., “Fuzzy boolean programming problems with fuzzy costs:
A general study.”, Fuzzy Sets and Systems, 81(1), 57-76, 1996.
10. Hitoshi Furuta, K.K., Miki Oi, Hiroyuki Sugimoto, “Life-Cycle Cost Evaluation of
Multiple Bridges in Road Network Considering Seismic Risk.”, Journal of the
Transportation Research Board, Special Volume CD 11-S, 343-347, 2005.
11. Hong, T. and Hastak, M., “Evaluation and determination of optimal MR&R strategies
in concrete bridge decks.”, Automation in Construction, 16(2), 165-175, 2007.
12. Jacobs, T.L., “Optimal Long-Term Scheduling of Bridge Deck Replacement and
Rehabilitation.”, J. Transp. Engrg, 118(2), 312-322, 1992.
13. Kong, J.S. and Frangopol, D.M., “Life-Cycle Reliability-Based Maintenance Cost
Optimization of Deteriorating Structures with Emphasis on Bridges.”, Journal of
Structural Engineering, 129(6), 818-828, 2003.
14. LIANG, T.-F., “Project management decisions using fuzzy linear programming.”,
International Journal of Systems Science, 37(15), 1141–1152, 2006.
15. Liu, M. and Frangopol, D.M., “Multiobjective Maintenance Planning Optimization for
Deteriorating Bridges Considering Condition, Safety, and Life-Cycle Cost.”, Journal of
Structural Engineering, 131(5), 833-842, 2005.
16. Liu, M. and Frangopol, D.M., “Time-Dependent Bridge Network Reliability: Novel
Approach.”, Journal of Structural Engineering, 131(2), 329-337, 2005.
17. Liu, M. and Frangopol, D.M., “Optimizing Bridge Network Maintenance Management
under Uncertainty with Conflicting Criteria: Life-Cycle Maintenance, Failure, and User
Costs.”, Journal of Structural Engineering, 132(11), 1835-1845, 2006.
18. Peidro, D., et al., “Fuzzy optimization for supply chain planning under supply, demand
and process uncertainties.”, Fuzzy Sets and Systems, In Press, Corrected Proof, 2009.
19. Petcherdchoo, A., Neves, L.A.C., and D.M. Frangopol, “Optimizing Lifetime
Condition and Reliability of Deteriorating Structures with Emphasis on Bridges.”,
Journal of Structural Engineering, 134(4), 544-552, 2008.
20. Rommelfanger, H., “Fuzzy linear programming and application.”, European Journal of
Operational Research, 92, 512-527, 1996.
21. Sadeghi, M. and Hosseini, H.M., “Energy supply planning in Iran by using fuzzy linear
programming approach (regarding uncertainties of investment costs).”, Energy Policy,
34, 993–1003, 2006.
22. Shih, L.-H., “Cement transportation planning via fuzzy linear programming.”, Int. J.
Production Economics, 58, 277-287, 1999.
23. Tanaka , H. and Asai, K., “Fuzzy linear programming with fuzzy numbers.”,
Fuzzy Sets and Systems, 13, 1-10, 1984.
24. Werners, B., “Interactive multiple objective programming subject to flexible
constraints.”, European Journal of Operational Research, 31, 42-349, 1987.
25. Wu, Y.-K., “On the manpower allocation within matrix organization: A fuzzy linear
programming approach.”, European Journal of Operational Research, 183(1), 384-393,
2007.
26. Yager, R.R., “A procedure for ordering fuzzy subsets of the unit interval.”, Information
Sciences, 24, 143-161, 1987.
27. Yang, S.-I., Frangopol, D.M. and Neves, L.C., “Service life prediction of structural
systems using lifetime functions with emphasis on bridges.”, Reliability Engineering &
System Safety, 86(1), 39-51, 2004.
28. Yang, S.-I., Frangopol, D.M. and Neves, L.C., “Optimum maintenance strategy for
deteriorating bridge structures based on lifetime functions.”, Engineering Structures,
28(2), 196-206, 2006.
29. Zayed, T.M., Chang, L.-M. and Fricker, J.D. “Life-Cycle Cost Based Maintenance Plan
for Steel Bridge Protection Systems.”, Journal of Performance of Constructed Facilities,
16(2), 55-62, 2002.
30. Zimmermann, H.-J., “Description and optimization of fuzzy systems.”, International
Journal of General Systems, 2, 209-215, 1976.